1.6 KiB
1.6 KiB
Design Plan
Inputs: target tests directory, reference result tests directory, DUT result tests directory
Output: a dashboard that displays completion rate, elapsed time, estimated time remaining, and a list of all tests that can be filtered by tags
Requirements:
- A test is marked completed when there is a filename match in result tests directory
- Dashboard can be accessed by different devices, but input directories are stored locally on one machine
- Login required in order to view dashboard
- Viewer
- Only able to view
- Admin
- Able to access and modify settings
- Viewer
- Can enter exclusions for tests that are not ran in settings
Front end UI requirements:
-
Completion rate and number of tests completed
- Overall completion rate
- CGW 452 completion rate
- number of tests completed for each type
- CGW453 completion rate
- number of tests completed for each type
-
Time elapsed
-
Estimated Time remaining
-
Estimated date to complete
- 16 hrs on weekdays
- 24 hrs on weekends
-
List of all tests
- Can filter by Tags:
- Completed: Boolean
- Type
- Device: String
- Rotation: String
- Test Point: String
- Station: String
- Band: String
- Channel: String
- Bandwidth: String
- RSSI: String
- Direction: String
- A P2P test with COE pairings should be displayed together
- P3P tests should be paired together by throttled/unthrottled
- Completed tests
- Display the avg throughput for each station
- Can filter by Tags: