Design Plan

Inputs: target tests directory, result tests directory

Output: a dashboard that displays completion rate, elapsed time, estimated time remaining, and a list of all tests that can be filtered by tags

Requirements:

  • A test is marked completed when there is a filename match in result tests directory
  • When there is a change in the input directories, data should update automatically or when refreshed
  • Dashboard can be accessed by different devices, but input directories are stored locally on one machine
    • Add SSO later

Front end UI requirements:

  • Completion rate

    • Overall completion rate
    • CGW 452 completion rate
    • CGW453 completion rate
  • Time elapsed

  • Estimated Time remaining

  • List of all tests

    • Can filter by Tags:
      • Completed: Boolean
      • Device: String
      • Rotation: String
      • Test Point: String
      • Station: String
      • Band: String
      • Channel: String
      • Bandwidth: String
      • RSSI: String
      • Direction: String